Join: Dec 2, 2008

Name: jamesk97

Gender: Male

Location: 60180, US

Videos Watched: 619

Subscribers: 11

Channel Views: 832

Videos (11)

Model 50 Burro crane unloading a railcar truck at IRM

  • Length: 1:47
  • Rating Average: n/a
  • View Count: 189
  • Author: jamesk97

Tags: 50  Burro  Crane  Illinois  model  Museum  railcar  Railway  truck  unloading 

The Illinois Railway Museum's model 50 Burro Crane unloading a railcar truck.

Illinois Terminal 277 and 518 at the Illinois Railway Museum

  • Length: 0:36
  • Rating Average: 5.00 from 3 people
  • View Count: 354' favoriteCount='2
  • Author: jamesk97

Tags: 277  518  and  Illinois  IRM  Museum  Railway  Terminal 

Illinois Terminal 277 and 518 heading west at the Illinois Railway Museum.

Minnesota Transfer 200 runby at IRM

  • Length: 1:1
  • Rating Average: 5.00 from 2 people
  • View Count: 145' favoriteCount='1
  • Author: jamesk97

Tags: 200  Alco  at  IRM  Minnesota  RS3  runby  Transfer 

Minnesota Transfer 200, an Alco RS3, with a nice sounding horn.

Favorites (5)

Starting of 45 ton GE engine.

  • Length: 5:11
  • Rating Average: 5.00 from 9 people
  • View Count: 9228' favoriteCount='14
  • Author: huejr

Tags: engine  of  starting 

Starting of rebuilt engine in Illinois railway museums United Sates Army GE 45 ton industrial switcher. The engine is a 6 cylinder cummins deisel. Engine finally starts on the third attempt.

IRM C&NW Scoot Westbound

  • Length: 0:30
  • Rating Average: 4.43 from 7 people
  • View Count: 3018' favoriteCount='15
  • Author: lzeje657

Tags: C&NW  F7  illinois  museum  railway  scoot  train  union 

The freshly painted F7 leads two bilevels westbound at Karstens crossing near sunset on Labor Day. Normal operating speed for this train is 30MPH, but a special 55MPH run was arranged after hours for members.

IRM C&NW Scoot High Speed Run

  • Length: 0:23
  • Rating Average: 5.00 from 3 people
  • View Count: 3017' favoriteCount='15
  • Author: lzeje657

Tags: C&NW  F7  illinois  museum  railway  scoot  train  union 

Freshly painted F7 411 shoves two bilevels past Karstens crossing on a high speed run on Labor day.